Not sure which survey you need?

Tell us about your site and we'll recommend the right one.

Use the survey finder
Surveyor recording the corner of a completed building with a total station (16:9, ≤180 KB WebP)Hero slide 1 of 3 · LCP imageSurveyor recording the corner of a completed building with a total station (16:9, ≤180 KB WebP)

As-built surveys · Nationwide coverage

As-Built Survey Services for Completed and Existing Works

Know exactly what was built, and where. We measure completed buildings, roads, drainage, pipelines and utilities, compare them with your design and deliver record drawings that your handover, facilities and design teams can rely on.

  • CAC registered · RC 7621688
  • SURCON Reg. No. 5824
  • Projects in all 36 states + FCT
  • 10 survey & geospatial services

Completed buildings: footprints, grid positions and finished floor levels.

01 / Definition

What is an as-built survey?

An as-built survey is a measured record of works as they actually stand on site after construction. Dexterpoint's as-built survey services capture the true position, level and size of completed buildings, roads, drainage, pipelines and utilities, then compare them with the design, so you can see what changed before handover.

Drawings show what was intended. Sites rarely match them exactly: a wall moves to clear a service, a manhole is raised to suit the road, a pipe is diverted around a rock. An as-built survey turns those changes into measured fact, on your project coordinates and levels, so nobody has to guess later.

Who it's for

Contractors

closing out a package and preparing handover documents.

Consultants and resident engineers

checking completed works against the approved drawings.

Developers, asset owners and facility managers

who need a reliable record survey for operation, maintenance and future works.

Architects and engineers

designing a refurbishment or extension who need an existing conditions survey, not old paper drawings.

02 / When you need it

When you need an as-built survey for construction

Record works while they are still visible. These are the moments to call us in.

Practical completion and handover

Give the client, consultant and facilities team measured record drawings of the works as delivered.

Before trenches are backfilled

Pipelines, ducts, drains and cable routes are easiest to record when they are exposed. Once the trench is closed, the chance to measure them directly is gone.

Milestone and stage checks

Confirm that foundations, slabs, road layers or drainage runs sit where the design says before the next stage covers them up.

Variations, claims and disputes

When the design changed on site, a measured record shows exactly what was built, so discussions start from facts.

Refurbishment, extension and change of use

Before you redesign an existing building or site, an existing conditions survey gives your designers real dimensions and levels to work from.

Asset records and new connections

Connect a new road, sewer or pipeline to existing works with confidence, and give asset owners data they can load into their maintenance and GIS systems.

Surveyor recording an exposed pipeline before the trench is backfilledPhoto · 21:9Surveyor recording an exposed pipeline before the trench is backfilled

03 / What we record

What our as-built surveys record

We agree the exact features and level of detail with you before fieldwork, so the record matches how it will be used. Typical scope includes:

We record what can be seen and safely reached.

Services that are already buried are recorded from their surface features, such as covers, valves and markers, unless they are exposed for us. That is why the best as-built records are taken in stages, while the work is still open.

Buildings and structures

  • Building outlines and corners
  • Grid lines and column positions
  • Wall lines and openings
  • Slab edges
  • Finished floor levels
  • Roof and parapet levels
  • Stair and lift cores

Roads and paved areas

  • Road centrelines
  • Carriageway edges
  • Kerb lines and levels
  • Footways
  • Junctions
  • Crossfalls
  • Road furniture
  • Lighting columns
  • Car parks

Drainage

  • Manholes, inspection chambers and catch pits
  • Cover levels and invert levels
  • Pipe directions and visible sizes
  • Culverts
  • Open channels and ditches
  • Headwalls and outfalls

Pipelines and utilities

  • Exposed pipe runs and top-of-pipe levels before backfill
  • Valves, chambers and marker posts
  • Hydrants
  • Meter boxes
  • Cable ducts
  • Poles, cabinets and other visible utility structures

Site and external works

  • Boundary walls and fences
  • Gates
  • Retaining walls
  • Hardstanding
  • Landscaping
  • External levels around buildings
  • Platforms or earthworks as finished

Existing conditions for refurbishment

  • Measured floor plans, elevations and sections
  • Ceiling and soffit heights
  • Visible structural elements
  • Doors and windows
  • Fixed services

For complex interiors, plant rooms and façades, we capture a dense point cloud through 3D laser scanning.

04 / Deliverables

As-built deliverables you receive

Your proposal lists every output before we start. Depending on the scope, you can receive:

As-built drawing showing built positions against the design lineIllustrationAs-built drawing showing built positions against the design line

As-built record drawings

CAD plans showing the as-constructed position and level of every feature in scope, on your project coordinates and drawing standards.

Colour-coded deviation plot: within / near / outside toleranceIllustrationColour-coded deviation plot: within / near / outside tolerance

Design comparison report

Measured values set against design values, with every deviation outside your specified tolerance clearly flagged in a table or colour-coded plot.

Coordinate and manhole schedule with cover and invert levelsSampleCoordinate and manhole schedule with cover and invert levels

Coordinate, level and drainage schedules

Point lists for corners, kerbs and levels, plus manhole records with cover and invert levels, in spreadsheet form.

Long section: finished levels and falls against designSampleLong section: finished levels and falls against design

Long sections and cross-sections

Profiles along roads, drains and pipelines that show finished levels and falls against the design.

Measured floor plan of an existing buildingSampleMeasured floor plan of an existing building

Measured building drawings

Floor plans, elevations and sections of existing buildings, ready for architects and engineers to design on.

Point-cloud render of a plant roomSamplePoint-cloud render of a plant room

Point clouds and 3D data

Dense, measurable 3D records of complex structures and interiors, captured through 3D laser scanning.

As-built survey report coverSampleAs-built survey report cover

Survey report

The control used, coordinate system and datum, methods, survey date, any areas not accessible, and anything your team should know before relying on the data.

Common formats include DWG/DXF, PDF, CSV/XLSX, SHP/GeoPackage and LAS/LAZ/E57.

Handover coming up? Survey before the evidence is covered

Book your as-built survey while trenches are open and finishes are still going in. Recording works in stages costs less than uncovering them later.

05 / Process

How an as-built survey works

1

Share your project and design

Send the site location, what needs to be recorded, the approved or issued-for-construction drawings, design files with coordinates if you have them, the tolerances in your specification and your handover deadline.

2

Agree the scope and outputs

We confirm the features and level of detail, the coordinate system and datum (matched to your project control), whether you need a straight record or a full design comparison, and the file formats. You receive it all in a written proposal.

3

Capture on site

We connect to your project control and measure every feature in scope, with photographs for context. Where needed, we return in stages to record works before they are covered.

4

Process, compare and check

We draw the as-built record, compare it with the design where agreed and flag any deviation against your specified tolerances. Data is checked against control before it leaves our hands.

5

Hand over and explain

You receive the drawings, schedules and survey report in the agreed formats. If deviations are flagged, we walk your engineer through them so decisions are made quickly.

Start with step 1

Total station set up to record completed construction worksPhoto · 4:5Total station set up to record completed construction works

06 / Methods

Methods and technology for accurate as-built records

We match the method to the detail and accuracy your specification calls for, often combining several on one site.

Total station.

Precise positions for building corners, kerbs, covers and structural details, especially where sightlines are short.

GNSS (RTK).

Fast, consistent coordinates across open sites, long roads and pipeline routes, tied to project control.

Precise levelling.

Floor levels, invert levels and drainage falls, where height matters most.

3D laser scanning.

Millions of measured points on façades, plant rooms and congested services, delivered as a point cloud.

Drone mapping.

A measurable aerial snapshot of large completed estates, earthworks and road schemes. See our drone surveying services.

Tolerances come from your project specification. Tell us what they are and we'll plan the survey to report against them.

07 / Which survey?

As-built survey vs setting-out and topographic surveys

Three surveys, three different questions. Choosing the right one saves time and fees.

As-built survey vs setting-out survey

CriterionAs-built surveySetting-out survey
Question it answersWhat was actually built, and where?Where should the works go?
Direction of informationFrom the site to a drawingFrom the drawing to the site
When it happensDuring and after constructionBefore and during construction
Starts fromCompleted or existing works, plus the design for comparisonApproved, issued-for-construction drawings and coordinates
Main outputRecord drawings, schedules and deviation reportsPegs, marks and setting-out records on site
Learn moreThis pageSetting-out survey services

As-built survey vs topographic survey

CriterionAs-built surveyTopographic survey
PurposeRecord and verify completed worksMap the ground before design
TimingAfter construction, or before refurbishmentBefore design and planning
What is measuredThe features of the works in scope, to the detail they were designedGround levels, contours and existing site features
Compared with a design?Yes, where agreedNo. It becomes the base for the design
Typical usersContractors, consultants, asset ownersArchitects, engineers, planners
Learn moreThis pageTopographic surveys for design
  1. Topographic survey
  2. Design
  3. Setting out
  4. Construction
  5. As-built survey

On a well-run project the surveys follow each other: a topographic survey informs the design, setting out puts it on the ground, and the as-built survey records the result.

08 / Coverage

As-built survey services anywhere in Nigeria

Your completed works might be an estate in Lagos, an office block in Abuja, a drainage scheme in Port Harcourt or a road in a rural LGA. Dexterpoint carries out as-built surveys in all 36 states and the FCT. Send us the location and your handover date, and we'll plan the mobilisation and site visits around your programme.

Access, security, site permits and weather are reviewed for every project before the survey dates are fixed.

Check availability for your site

09 / Cost

What affects the cost of an as-built survey

Every as-built survey is planned on its own scope. The fee depends on:

Size and quantity.

Site area, building floor area, road or pipeline length, and the number of features to record.

Level of detail.

A record of key positions and levels costs less than a full measured survey of every element.

Record only, or full comparison.

Checking every element against the design and reporting deviations adds processing time.

Staged visits.

Recording buried services before backfill may mean several short visits instead of one.

Access and site activity.

Live roads, occupied buildings, working sites and restricted areas need extra planning.

Method and deliverables.

Scanning or drone capture, your CAD standards, and any 3D or BIM requirements.

Location and existing data.

Mobilisation to site, and whether reliable project control and design files already exist.

Send us your drawings and handover requirements, and we'll return a clearly written scope of work.

Talk to Us About Your As-Built Survey

10 / FAQ

As-built survey questions, answered

Straight answers to the questions contractors, consultants and owners ask us most.

Still have a question?

Talk to a surveyor directly.

What is the difference between an as-built survey and as-built drawings?

As-built drawings are often the design drawings marked up by the contractor to show changes. An as-built survey measures the completed works directly and produces record drawings from those measurements, so you can check or replace marked-up drawings before handover.

When should I commission an as-built survey?

As early as you can plan it. Record pipelines, drains and ducts before backfill, and structural elements before finishes cover them. For a simple completed site, book once the works in scope are finished and accessible.

Does an as-built survey confirm my building is safe or compliant?

No. It records measured positions, levels and dimensions and compares them with the design. Structural safety, regulatory approval and contractual acceptance are decided by the responsible engineer, authority or contract administrator. Our measurements give them the facts to make that call.

What tolerances do you check the works against?

The tolerances in your project specification. Send them with your drawings and we will report every measured value against them, so deviations are easy to see. If no tolerances are specified, your engineer should set them before the comparison is done.

Can you survey underground pipes and cables?

We record what is exposed or visible. Pipes, ducts and cables are measured directly while the trench is open; once covered, we record them from surface features such as covers, valves and markers.

Can you provide a point cloud or 3D model?

Yes, where the scope calls for it. For complex buildings, plant and façades, we capture a point cloud using 3D laser scanning services for design, coordination and asset records.

How long does an as-built survey take?

It depends on site size, the number of features, access and whether a full design comparison is needed. Your proposal sets out the fieldwork and delivery dates.

What do you need from me to get started?

The site location, what needs to be recorded, the approved or issued-for-construction drawings, design coordinates or CAD files if available, any specification tolerances, your required formats and your handover date.

12 / Get started

Tell us about your as-built survey

Tell us what was built, where it is and when you need the record. We'll reply with the right scope, the outputs you'll receive and a clear scope of work.

  • CAC registered · RC 7621688
  • SURCON Reg. No. 5824
  • Projects in all 36 states + FCT
  • 10 survey & geospatial services

Tell us about your as-built survey

Fields marked * are required.

What needs recording?

Have drawings, a survey plan or a KML file? Don't attach them here. After we reply, we'll share a secure way to send them, or you can email Dexterpointsolutions@gmail.com.