Serving all 36 states and the FCT 0706 825 8807Dexterpointsolutions@gmail.com

Land & property

Land & Cadastral Surveying

Engineering & construction

Topographic SurveyingSetting-Out SurveysAs-Built SurveysRoute Surveys

Aerial & mapping

Drone & Aerial SurveyingRemote Sensing & MappingGIS & Spatial Analysis

Water & 3D

Hydrographic Surveying3D Laser Scanning
Not sure which survey you need?

Tell us about your site and we'll recommend the right one.

Use the survey finder
Surveyor setting out a building grid line with a total station on a cleared building site (16:9, ≤180 KB WebP/AVIF)Hero slide 1 of 3 · LCP imageSurveyor setting out a building grid line with a total station on a cleared building site (16:9, ≤180 KB WebP/AVIF)

Setting-out surveys · Nationwide coverage

Setting-Out Survey Services for Construction Sites

Build it in the right place, at the right level, first time. We establish site control and set out grids, piles, columns, road centrelines, kerbs, drainage and earthworks from your approved drawings, then check every mark before your team builds on it.

  • CAC registered · RC 7621688
  • SURCON Reg. No. 5824
  • Projects in all 36 states + FCT
  • 10 survey & geospatial services

Buildings: grid lines, pile centres and column positions.

01 / Definition

What is a setting-out survey?

A setting-out survey transfers the positions and levels on approved construction drawings onto the ground, as pegs, nails, profiles and marks your team can build from. Dexterpoint's setting out survey services cover site control, building grids, piles, road alignments, drainage and earthworks, so every element starts in exactly the right place.

Every error made at setting out is built into concrete. A grid line in the wrong place moves every column on it. A wrong level sends a drain the wrong way. Good setting out is quick, careful work early in the job that protects every pour, every pipe and every course of blocks that follows.

Who it's for

Main contractors

who need a dedicated setting-out engineer for a project or a busy stage.

Specialist subcontractors

for piling, civils, roads and drainage who need positions and levels on the day they mobilise.

Developers and estate builders

without an in-house surveyor who want plots, roads and buildings in the right place.

Consultants and resident engineers

who need an independent check of setting out before works proceed.

02 / When you need it

When your project needs construction setting out

Setting out isn't a single visit. It follows the job from the first peg to the last kerb.

  1. STAGE 01

    Site establishment

    Before anything is excavated, control stations and benchmarks are fixed, so every later mark comes from the same reference.

  2. STAGE 02

    Piling and foundations

    Pile centres, pad and strip footings and starter positions, set out ahead of the rig or the excavator.

  3. STAGE 03

    Frame and superstructure

    Grid lines and levels transferred up each floor, with column and wall positions marked on every new slab.

  4. STAGE 04

    Roads and estate infrastructure

    Centrelines, edges, kerbs and levels for estate roads, access roads and car parks, set out ahead of each layer.

  5. STAGE 05

    Drainage and utilities

    Manhole positions, pipe lines and invert levels, so drains fall the way the engineer designed them.

  6. STAGE 06

    Earthworks and platforms

    Cut and fill limits, slope pegs and formation levels for site clearance, building platforms and embankments.

03 / What we set out

What we set out on site

We set out the elements your drawings define and your programme needs, in the order your team will build them.

Site control and benchmarks

Control stations and temporary benchmarks tied to the project coordinate system and datum, referenced, protected and re-checked through the job.

Building grids and footprints

Main grid lines, building corners and offsets, with profiles or offset pegs placed clear of the excavation so lines survive the work.

Piles, columns and foundations

Pile centres, pile caps, pad and strip footings, column starter positions and holding-down bolt positions.

Levels

Finished floor levels, slab and formation levels, and site benchmarks your foremen can level from every day.

Roads and kerbs

Road centrelines at set chainages, offsets, carriageway edges, kerb lines and levels, junction radii and crossfall information as designed.

Drainage

Manhole and chamber centres, pipe lines, invert levels and gradients, culverts, channels and outfalls, with sight rails or offset pegs where your crew needs them.

Earthworks

Top and toe of slope, cut and fill pegs, platform levels and formation levels, so your plant operators dig and fill to design.

Setting out works from the design and the project control. If your building lines depend on plot boundaries, confirm the boundary first with a land and cadastral survey.

04 / Drawings and roles

Setting out from approved drawings: who does what

Issued-for-construction drawings only

We set out from issued-for-construction (IFC) drawings or approved digital design data, such as coordinate schedules or CAD files with the alignment and levels. Before fieldwork we check the revision, units, coordinate system and datum, and compute the setting-out data from the design. A superseded revision can put a whole foundation in the wrong place, so this check is never skipped.

When the design and the site don't agree

Sometimes a dimension doesn't close, a level clashes with an existing road or a pile lands on a buried obstruction. We stop, record what we found and raise it with your engineer or designer.

The designer decides; we set out the answer.

Who does whatTYPICAL ROLES
RoleResponsibility
Design engineer / architectOwns the design, coordinates and levels. Resolves queries and issues revisions.
ContractorBuilds the works, usually holds contractual responsibility for setting out, and protects the marks on site.
Resident engineer / supervising consultantChecks and accepts setting out and works where the contract gives them that role.
DexterpointTransfers the approved design to site, verifies it, records the checks and flags discrepancies, for whoever engages us.

Your contract sets out who is responsible for setting-out accuracy. We work to it.

Surveyor checking a setting-out mark before concrete is poured (close-up of a nail or peg with a prism pole held over it)Photo · 4:5Surveyor checking a setting-out mark before concrete is poured (close-up of a nail or peg with a prism pole held over it)

05 / Verification

Checked before you build: verification after setting out

A mark is only useful if it's right. We check our work before your team relies on it.

  • Independent checks.

    Key points are checked from a second control station or by a different method from the one used to set them.

  • Geometry checks.

    Grid spacings, diagonals, offsets and chainages are measured back against the design dimensions.

  • Level checks.

    Benchmarks and set levels are closed back to control, not taken on trust.

  • Pre-pour and pre-backfill checks.

    Positions and levels are re-checked before concrete, blinding or backfill makes them permanent.

Every check is recorded against the tolerances in your project specification. When the works are built, an as-built survey of the completed works records the final result.

Breaking ground soon? Fix your control first

Book site control and your first setting out before the excavator arrives. Every mark that follows depends on it.

06 / Process

How our setting out survey services work

1

Send your drawings and programme

Share the site location, the IFC drawings or design files, the elements to set out, any existing control information and your construction programme.

2

Design review and setting-out data

We confirm the revision, units, coordinate system and datum, compute the setting-out coordinates and levels, and flag anything that doesn't close before we reach site.

3

Establish and verify control

On site, we fix or check the control stations and benchmarks, then tie them to the project coordinate system so every mark comes from one reference.

4

Set out and mark

We place pegs, nails, profiles and paint marks at the agreed positions and offsets, working with your site manager on sequence, access and safety.

5

Check, record and return

Marks are checked and recorded, and you receive the setting-out records. We come back as each new stage is ready, for as long as your programme needs.

REPEATS PER STAGE

Send your drawings

07 / Deliverables

What you receive from a setting-out survey

Marks on the ground

Pegs, nails, paint marks, offset pegs, profile boards and sight rails, placed where your crew needs them and protected from the work.

Control and benchmark schedule

Coordinates and levels of every control station and benchmark, with descriptions and sketches so your team can find and reuse them.

Setting-out records

A record of each point set out: design value, set value, the check made and the date, so you have evidence of what was placed.

Setting-out coordinates

The computed points and levels from the design in CSV or spreadsheet form, for your engineers and for future checks.

Marked-up drawings

Drawings showing what was set out on each visit, so the site team and the consultant can see progress at a glance.

Design query notes

A clear note of any dimension, level or clash that didn't work on site, ready to send to the designer.

Records and data in PDF, CSV/XLSX and DWG/DXF.

08 / Methods

Methods and equipment for engineering setting-out surveys

We match the instrument to the job and the tolerance your specification sets.

Total station.

The workhorse for grids, piles, columns and bolts, where positions must be tight and sightlines are short.

GNSS (RTK).

Fast setting out of control, roads, plots and earthworks across open sites, where its accuracy suits the task.

Automatic or digital level.

Benchmarks, floor levels, invert levels and formation levels.

Profiles, sight rails and offsets.

Simple, durable site marks that let your crew build accurately between our visits.

Setting-out tolerances come from your project specification. We plan our methods and checks around them.

Total station on a concrete slab marking column positions (chalk or paint grid marks visible)Photo · 4:5Total station on a concrete slab marking column positions (chalk or paint grid marks visible)

09 / Which survey?

Setting-out survey vs as-built survey

Both happen on construction sites and both use the same control, but they do opposite jobs.

CriterionSetting-out surveyAs-built survey
What it doesPuts the design onto the groundRecords what was built and measures it against the design
Information flowDrawing → groundGround → drawing
Project stageBefore each element is builtOnce elements are built, or at completion
You give usIFC drawings, coordinates and levelsAccess to the finished works, plus the design to compare with
You getMarks on site, control schedules and setting-out recordsRecord drawings, schedules and a deviation report
Typical buyerContractor or subcontractorContractor, consultant or asset owner
Learn moreThis pageAs-built survey services

Still at the design stage? You need ground levels and site features first. Start with a topographic survey for your site.

10 / Coverage

Setting-out surveys for sites across Nigeria

Whether you're piling for a tower in Lagos, building an estate road outside Abuja or laying drainage in Port Harcourt, we can mobilise to your site. Dexterpoint provides setting out for construction projects in all 36 states and the FCT, timed to your programme rather than ours.

Site access, security and safety requirements are agreed with your site manager before each visit.

Check dates for your site

11 / Cost

What affects the cost of setting out

Setting out is priced on the work your programme needs. The main factors are:

Number of elements.

How many grids, piles, columns, chainages, manholes or levels need to be set out.

Number of visits.

A one-off set-out, a short series of visits, or a surveyor retained for a stage of the job.

Control.

Whether reliable site control exists or has to be established and verified first.

Design data.

Coordinated CAD files are quicker to work from than dimensions read off PDF drawings.

Checks and records.

The level of independent checking and documentation your contract or consultant requires.

Site conditions.

Access, traffic, working hours, safety requirements and how busy the site is.

Location.

Mobilisation to site and any accommodation for longer stays.

Send your drawings and programme and we'll plan the setting out stage by stage, in writing.

Talk to Us About Your Setting-Out Survey

12 / FAQ

Setting-out questions, answered

What contractors and developers ask before they book.

Still have a question?

Call or WhatsApp a surveyor directly.

Who is responsible for setting out on a construction site?

Your contract decides. In most building and civil engineering contracts the contractor is responsible for setting out the works correctly, while the designer owns the design and the supervising engineer checks. We can act as the contractor's setting-out surveyor or as an independent checker for the client or consultant.

Can you set out from PDF drawings?

Yes, if the drawings are approved for construction and fully dimensioned or coordinated. CAD files or coordinate schedules are faster and leave less room for error, so send them if you have them. Draft or superseded drawings can't be set out.

What happens if the drawings don't match the site?

We pause that element and raise a query with your designer, with our measurements attached. Once they confirm or revise, we set it out. We never change the design on site.

How accurate is your setting out?

As accurate as your project specification requires. Tolerances are set by your specification, and we choose the instrument, method and checks to meet them.

Do I need a topographic survey before setting out?

Usually, at an earlier stage. A topographic survey gives designers the ground levels; setting out then places their finished design on the ground. If the site has changed since, tell us, as it may affect levels.

Can you check setting out done by another team?

Yes. We can independently verify grids, piles, levels or alignments set out by your own engineer or another contractor, and record the results before work continues.

How soon can you start, and can you stay for the whole job?

Share your start date and programme and we'll schedule visits around it, either one-off or repeated as each stage is ready.

What do you need from me to get started?

The site location, IFC drawings or design files, the elements to set out, any existing control or benchmark information, your programme and the tolerances in your specification.

14 / Get started

Tell us about your setting-out survey

Send us your drawings, your programme and what needs setting out. We'll reply with a clear scope of work and a visit plan.

  • CAC registered · RC 7621688
  • SURCON Reg. No. 5824
  • Projects in all 36 states + FCT
  • 10 survey & geospatial services

Tell us about your setting out

Fields marked * are required.

What needs setting out?

Have drawings, a survey plan or a KML file? Don't attach them here. After we reply, we'll share a secure way to send them, or you can email Dexterpointsolutions@gmail.com.