Shared assetTopographic page hero imageTopographic Surveying
Ground levels, contours and site features that designers need before there is anything to set out.
Get a site topographic surveyTell us about your site and we'll recommend the right one.
Use the survey finder
Hero slide 1 of 3 · LCP imageSurveyor setting out a building grid line with a total station on a cleared building site (16:9, ≤180 KB WebP/AVIF)Setting-out surveys · Nationwide coverage
Build it in the right place, at the right level, first time. We establish site control and set out grids, piles, columns, road centrelines, kerbs, drainage and earthworks from your approved drawings, then check every mark before your team builds on it.
01 / Definition
A setting-out survey transfers the positions and levels on approved construction drawings onto the ground, as pegs, nails, profiles and marks your team can build from. Dexterpoint's setting out survey services cover site control, building grids, piles, road alignments, drainage and earthworks, so every element starts in exactly the right place.
Every error made at setting out is built into concrete. A grid line in the wrong place moves every column on it. A wrong level sends a drain the wrong way. Good setting out is quick, careful work early in the job that protects every pour, every pipe and every course of blocks that follows.
who need a dedicated setting-out engineer for a project or a busy stage.
for piling, civils, roads and drainage who need positions and levels on the day they mobilise.
without an in-house surveyor who want plots, roads and buildings in the right place.
who need an independent check of setting out before works proceed.
02 / When you need it
Setting out isn't a single visit. It follows the job from the first peg to the last kerb.
Before anything is excavated, control stations and benchmarks are fixed, so every later mark comes from the same reference.
Pile centres, pad and strip footings and starter positions, set out ahead of the rig or the excavator.
Grid lines and levels transferred up each floor, with column and wall positions marked on every new slab.
Centrelines, edges, kerbs and levels for estate roads, access roads and car parks, set out ahead of each layer.
Manhole positions, pipe lines and invert levels, so drains fall the way the engineer designed them.
Cut and fill limits, slope pegs and formation levels for site clearance, building platforms and embankments.
03 / What we set out
We set out the elements your drawings define and your programme needs, in the order your team will build them.
Control stations and temporary benchmarks tied to the project coordinate system and datum, referenced, protected and re-checked through the job.
Main grid lines, building corners and offsets, with profiles or offset pegs placed clear of the excavation so lines survive the work.
Pile centres, pile caps, pad and strip footings, column starter positions and holding-down bolt positions.
Finished floor levels, slab and formation levels, and site benchmarks your foremen can level from every day.
Road centrelines at set chainages, offsets, carriageway edges, kerb lines and levels, junction radii and crossfall information as designed.
Manhole and chamber centres, pipe lines, invert levels and gradients, culverts, channels and outfalls, with sight rails or offset pegs where your crew needs them.
Top and toe of slope, cut and fill pegs, platform levels and formation levels, so your plant operators dig and fill to design.
Setting out works from the design and the project control. If your building lines depend on plot boundaries, confirm the boundary first with a land and cadastral survey.
04 / Drawings and roles
We set out from issued-for-construction (IFC) drawings or approved digital design data, such as coordinate schedules or CAD files with the alignment and levels. Before fieldwork we check the revision, units, coordinate system and datum, and compute the setting-out data from the design. A superseded revision can put a whole foundation in the wrong place, so this check is never skipped.
Sometimes a dimension doesn't close, a level clashes with an existing road or a pile lands on a buried obstruction. We stop, record what we found and raise it with your engineer or designer.
The designer decides; we set out the answer.
| Role | Responsibility |
|---|---|
| Design engineer / architect | Owns the design, coordinates and levels. Resolves queries and issues revisions. |
| Contractor | Builds the works, usually holds contractual responsibility for setting out, and protects the marks on site. |
| Resident engineer / supervising consultant | Checks and accepts setting out and works where the contract gives them that role. |
| Dexterpoint | Transfers the approved design to site, verifies it, records the checks and flags discrepancies, for whoever engages us. |
Your contract sets out who is responsible for setting-out accuracy. We work to it.
Photo · 4:5Surveyor checking a setting-out mark before concrete is poured (close-up of a nail or peg with a prism pole held over it)05 / Verification
A mark is only useful if it's right. We check our work before your team relies on it.
Key points are checked from a second control station or by a different method from the one used to set them.
Grid spacings, diagonals, offsets and chainages are measured back against the design dimensions.
Benchmarks and set levels are closed back to control, not taken on trust.
Positions and levels are re-checked before concrete, blinding or backfill makes them permanent.
Every check is recorded against the tolerances in your project specification. When the works are built, an as-built survey of the completed works records the final result.
Book site control and your first setting out before the excavator arrives. Every mark that follows depends on it.
06 / Process
Share the site location, the IFC drawings or design files, the elements to set out, any existing control information and your construction programme.
We confirm the revision, units, coordinate system and datum, compute the setting-out coordinates and levels, and flag anything that doesn't close before we reach site.
On site, we fix or check the control stations and benchmarks, then tie them to the project coordinate system so every mark comes from one reference.
We place pegs, nails, profiles and paint marks at the agreed positions and offsets, working with your site manager on sequence, access and safety.
Marks are checked and recorded, and you receive the setting-out records. We come back as each new stage is ready, for as long as your programme needs.
↻REPEATS PER STAGE07 / Deliverables
Pegs, nails, paint marks, offset pegs, profile boards and sight rails, placed where your crew needs them and protected from the work.
| Stn | E | N | RL |
|---|---|---|---|
| CS1 | 49.835 | 517 973.905 | 34.913 |
| TBM2 | 524 135.112 | 57.509 | 522 017.775 |
Coordinates and levels of every control station and benchmark, with descriptions and sketches so your team can find and reuse them.
| Pt | Design | Set | Check | Date |
|---|---|---|---|---|
| P01 | 511 420.982 | 518 362.497 | ✓ | 14/03 |
| P02 | 538 734.812 | 40.120 | ✓ | 14/03 |
| P03 | 512 457.251 | 33.983 | ✓ | 14/03 |
| P04 | 48.702 | 60.804 | ✓ | 14/03 |
A record of each point set out: design value, set value, the check made and the date, so you have evidence of what was placed.
| ID | Easting | Northing | Level |
|---|---|---|---|
| A1 | 505 085.222 | 57.388 | 33.971 |
| A2 | 538 460.848 | 518 208.150 | 558 735.344 |
| B1 | 43.976 | 535 808.820 | 552 538.172 |
| B2 | 529 626.277 | 58.583 | 528 408.872 |
The computed points and levels from the design in CSV or spreadsheet form, for your engineers and for future checks.
Drawings showing what was set out on each visit, so the site team and the consultant can see progress at a glance.
A clear note of any dimension, level or clash that didn't work on site, ready to send to the designer.
Records and data in PDF, CSV/XLSX and DWG/DXF.
08 / Methods
We match the instrument to the job and the tolerance your specification sets.
The workhorse for grids, piles, columns and bolts, where positions must be tight and sightlines are short.
Fast setting out of control, roads, plots and earthworks across open sites, where its accuracy suits the task.
Benchmarks, floor levels, invert levels and formation levels.
Simple, durable site marks that let your crew build accurately between our visits.
Setting-out tolerances come from your project specification. We plan our methods and checks around them.
Photo · 4:5Total station on a concrete slab marking column positions (chalk or paint grid marks visible)09 / Which survey?
Both happen on construction sites and both use the same control, but they do opposite jobs.
| Criterion | Setting-out survey | As-built survey |
|---|---|---|
| What it does | Puts the design onto the ground | Records what was built and measures it against the design |
| Information flow | Drawing → ground | Ground → drawing |
| Project stage | Before each element is built | Once elements are built, or at completion |
| You give us | IFC drawings, coordinates and levels | Access to the finished works, plus the design to compare with |
| You get | Marks on site, control schedules and setting-out records | Record drawings, schedules and a deviation report |
| Typical buyer | Contractor or subcontractor | Contractor, consultant or asset owner |
| Learn more | This page | As-built survey services |
Still at the design stage? You need ground levels and site features first. Start with a topographic survey for your site.
10 / Coverage
Whether you're piling for a tower in Lagos, building an estate road outside Abuja or laying drainage in Port Harcourt, we can mobilise to your site. Dexterpoint provides setting out for construction projects in all 36 states and the FCT, timed to your programme rather than ours.
Site access, security and safety requirements are agreed with your site manager before each visit.
Check dates for your site11 / Cost
Setting out is priced on the work your programme needs. The main factors are:
How many grids, piles, columns, chainages, manholes or levels need to be set out.
A one-off set-out, a short series of visits, or a surveyor retained for a stage of the job.
Whether reliable site control exists or has to be established and verified first.
Coordinated CAD files are quicker to work from than dimensions read off PDF drawings.
The level of independent checking and documentation your contract or consultant requires.
Access, traffic, working hours, safety requirements and how busy the site is.
Mobilisation to site and any accommodation for longer stays.
Send your drawings and programme and we'll plan the setting out stage by stage, in writing.
Talk to Us About Your Setting-Out Survey12 / FAQ
What contractors and developers ask before they book.
14 / Get started
Send us your drawings, your programme and what needs setting out. We'll reply with a clear scope of work and a visit plan.